Reserve Bank of India, Thiruvananthapuram had invited e-tender for Supply, installation, testing and commissioning of Centralized Dust Controller system for CVPS at Bank’s Main Office Building, Thiruvananthapuram, through the RBI Website and MSTC Portal on August 7, 2025. 2. Based on the queries received from some of the bidders, the following changes have been accepted: | Sl. No. | Query | Bank’s Clarification | | a. | Clarification regarding the exact number of Extractor arms with groutable pipe stands required. (Please refer Scope of work and technical specifications, Schedule of quantity and BOQ- Page 34, 36 and 56 of tender document) | Total number of Extractor arms with groutable pipe stands required are two nos. | | b. | Clarity regarding the number of spare filters required. (Please refer Schedule of quantity and BOQ- Page 36 and 56 of tender document) | The additional number of spare electrostatic modules and spare filters required are: a. Electrostatic module- 2 nos. b. Pre filters – 4 nos. c. Post filters – 2 nos. The existing number of quantities installed in the machine as per the manufacturer’s standards. | 3. All other terms and conditions, specifications etc. as mentioned in the tender shall remain the same. 4. This document will form a part of the tender document (Part I) for the above work and signed copy of this document shall be submitted along with tender (Part-I). Regional Director (Kerala and Lakshadweep) | |