Extension of Last Date of Submission (e-Tender No: RBI/Chennai Regional office/Estate/3/23-24/ET/85 [DSITCOFIPPABXSYSTEMATRBI MOP]) A ‘Pre-Bid Meeting’ for the captioned tender was conducted as per schedule at 11:00 Hrs on October 31, 2023 in Conference Room-I, 2nd Floor, Reserve Bank of India, Chennai. The following staff members of RBI and intending bidders were present during the pre-bid meeting: | Sl. No. | Name and designation of the RBI official | | 1. | Shri. K.S. Chakrawarthy, Deputy General Manager (Estate) | | 2. | Shri. Randeep Sangwan, Assistant Manager (Tech-Elec) (Estate) | | 3. | Smt. N. Sai Sameera, Assistant Manager (Estate) | | 4. | Shri Jevagapandian M, Junior Engineer (Tech-Elec) (Estate) | | 5. | Shri. Arjun Kumar, Assistant (Estate) | | Sl. No. | Name of the intending bidder | Name of the representative of the intending bidder | | 1. | M/s Coral Telecom Ltd | • Shri. K Pasubathi | | 2. | M/s Intellicon Pvt Ltd | • Shri. M. S. Sundaresan • Shri. Suresh Rajagopal | The following queries / proposals were raised by the above bidders during the pre-bid meeting. The clarifications given by the Bank are as follows: | Sl. No. | Query / Proposal | Bank’s response | | 1. | Sought clarifications whether IP Phones should be provided with separate Color Display unit for DSS or it has to be in-built in the same IP Phone? | It is clarified that a separate DSS unit shall be provided with or without display. The technical specifications mentioned for IP based phone remains unaltered. | | 2. | Sough clarification whether to consider OFC or CAT 6 cable for interconnection, the required quantity and laying method. Further sought clarification on the type of OFC laying required i.e., whether it has to be done in PVC Conduits / PVC casing Caping / underground etc. | It is clarified that OFC shall be used for interconnection. Approximate quantity of OFC cable is 500 mtr.
OFC shall be laid through medium duty PVC Conduits / PVC Casing through false ceiling / on wall. | | 3. | Whether all the 6 Cores of OFC to be terminated on LIU or only single Core? | It is clarified that all the 6 cores of OFC shall be terminated on 6 core LIU with necessary patch cords and patch panel. | | 4. | Sought clarifications on the quantity of uplink ports required for L2 Switches and whether the ports shall be 1G or 10G SFP modules. | It is clarified that L2 switch with 04 uplink ports of minimum 1G – SFP module shall be provided. | | 5. | Whether EMD amount of Rs 74,000/- shall be submitted in the form of Bank Guarantee. | It is clarified that EMD amount shall be remitted by NEFT/RTGS before the due date as specified in “Guidelines for e-Procurement” of the tender document. Instructions in this regard will remain the same. | | 6. | Sought clarifications regarding the requirement of POC (Proof of Concept) / Demo for Server GW IP PBX to ascertain that the availability of features and specifications. | It is clarified that bidders shall submit TEC certificate as mentioned in the Clause 7.3 of Section-IX of the tender document. | Note: Above amendments / clarifications are issued for the information for all intending bidders. Minutes of the pre-bid meeting shall form part of tender. All other parts of the tender document continue to remain unaltered. Submission of tenders shall be construed to be in conformity to the bid document and amendments/clarifications. Regional Director Reserve Bank of India Chennai | |