Date : Jul 29, 2022
Clarifications of Minutes of Pre-Bid meeting - Design, Supply, Installation, Testing and Commissioning of 2 nos. of Passenger Lifts (1 New and 1 old) for Deputy Governor`s Flats at Vasant Vihar Tower, Nepean Sea Road, Mumbai

Corrigendum dated August 02, 2022

In continuation to earlier minutes of the pre-bid meeting uploaded in RBI & MSTC portal on July 27, 2022, the following queries were again raised by one of the participants vide e-mail and our clarifications are as under

Sr. no. Vendor Query Bank’s Reply
01 In the specification (Sec VII, 11. Products-11.01 & 11.02) it is mentioned “Hall Lanterns / direction indicator with volume adjustable electronic chime for each lift’’ and firm have mentioned that being Simplex lift, hall Lanterns is not required and only direction indicator will be provided  For the specification mentioned as “Hall Lanterns/ direction indicator”, it is meant that either Hall Lanterns or direction indicator is to be provided.
02 Firm required more clarity on the specification (Sec VII, 11. Products-11.01 & 11.02) mentioning about “Car Reservations Services with parking” Auto/ attendant mode key switch will be used for car reservation service.
03 Regarding specification (Sec VII, 11. Products-11.01 & 11.02) mentioning provision of “OS Proximity Limit switches” the firm informed that such switch is not available. Specification to be read as providing “Limit switches” only as per OEM standards.
04 Specification (Sec VII, 11. Products-11.01 & 11.02) mentioning “Self-dialing three-way communication system actuated by pressing alarm button”. The firm have informed that two-way intercommunication system shall be provided by actuating its respective button and not on alarm button. The request has been acceded to.
05 Specification (Sec VII, 11. Products-11.01 & 11.02) mentioning provision of “Traction steel wire belt type to suit machine manufacturer’s requirements”. However, the firm informed that Traction steel wire ropes will be provided. The technical specification is modified to be read as “Traction steel wire belt or ropes to be provided as per OEM specification”.
06 Specification (Sec VII, 11. Products-11.01 & 11.02) is mentioning of providing “Flame and moisture resistant outer cover to prevent travelling cable from rubbing or chafing against lift well or equipment within lift well”. However, firm informed that FRLS travelling cable will be provided. The request has been acceded to.
07 Specification (Sec VII, 11. Products-11.01 & 11.02) mentioning making provision for connecting to suitable traffic management software. The firm informed that Potential free contacts shall be provided. The request has been acceded to.
08 The specification is mentioning that “it should be possible to provide an elevator management system to monitor the performance of the lift”. Contractor informed that Potential free contacts will be provided. The request has been acceded to.

2. All remaining other terms and conditions of the tender shall remain same.

Above changes are not causing any financial implications and thus the total estimated cost remains unchanged.

3. Further, kindly note that the last date of submission of the tender remains unchanged i.e, August 1, 2022.