Extension of Last Date of Submission dated September 16, 2026 Extension of Last Date of Submission dated September 09, 2026 The pre-bid meeting for the captioned work was conducted by Estate Department, at Conference Room, Main Office Building on July 21, 2026 at 11:00 AM in presence of the following: For Reserve Bank of India: -
Shri B. Kamal Nayak, Assistant General Manager -
Shri. R K Khandelwal, Assistant Manager (Tech-Electrical) -
Shri. Palash Chaurasia, Assistant Manager (Estate) -
Shri. Swapnil Tule, Junior Engineer (Tech-Electrical) Tenderers: -
Ku. Kavita (M/s Advance refrigeration engineering) -
Smt. Apurva Raut (M/s Advance refrigeration engineering) -
Shri. Harshvardhan Raizada (M/s. Weartech engineers pvt. ltd.) -
Shri. Abdul Khan (M/s Sterling and Wilson) -
Shri. Yogesh Chandrayan (M/s Vertiv Energy Pvt. Ltd.) -
Shri. Tom Eapen Dominie (M/s Simi Electronics) Queries received from following tenderers through e-mail: -
M/s Airview Engineers (Query 1-4) -
Smt. Indu Kapoor (M/s Interioarch IT Infra - Query 5) -
Shri Sumit Shokeen (M/s Adore HVAC Contractor – Query 5) Gist of the queries raised by the prospective bidders (through email) and Bank’s clarification on the same is as follows: | Clause | Query by the vendor | Bank’s Remarks | | Fan Diameter – Minimum 595 dia. | Restrictive to single make's fan size; request CFM-based specification | Fan Diameter – Minimum 595 dia. Or OEM specific accepted. | | Ambient Design Condition – (-5°C to 45°C) | Appears copied from another location; not applicable to Nagpur | The ambient range is mentioned in Section-V as -5°C to 45°C (ambient temperature of Nagpur) | | Dehumidification Cycle – Split-Suction / Split-Liquid | Terminology specific to one manufacturer | No change in tender specification | | Discharge Configuration – Floor Discharge / Bottom Discharge | Internal contradiction creating ambiguity | The specification “floor discharge” and “bottom discharge” are same terms. | | - | The technical specifications mentioned in the tender appear to be specific to a single specific OEM | No specific requirement mentioned. | The Bank will not be bound to entertain any further query/clarification from any vendor/contractor in future. | |