Date : Jan 29, 2019
Minutes of Pre-bid meeting - SITC of Microprocessor based Security Alarm System for Bank’s Main office Building, Hyderabad

Pre-bid meeting for the captioned work was held on January 28, 2019 at 11:30 AM in the meeting room, first floor in Main Office Building to clarify the queries of the bidders. The meeting was attended by the following persons:

Bank’s Representatives Firm’s representative
1. Shri K.V Sivaraman, AGM, Estate 1. Sh S D A Subham, M/s Enseigner Pvt Ltd
2. Shri U Ravi Kumar, Manager (T) 2. Sh Shashidhar K, M/s Vista Network
3. Ms Revati Kottakota, Manager (T) 3. Sh. Shailender Singh, M/s Atluri & Co.
4. Ms J. Anita, AM 4. Sh. B Mahesh Babu, M/s Atluri & Co
5. Shri Abhishek Mishra, AM 5. Sh. Anuj Arora, M/s Automation System
6. Shri Apoorva Singhal, JE (E) 6. Sh. Sachin. M/s Rosslare
  7. Sh. G. Praveen, M/s Vista Network
  8. Sh. Sharjeel, M/s Vista Network
  9. Sh. Pratap, M/s Tech SIS

Further to the discussions held with the tenderers, clarifications arrived thereof are indicated as under.

  1. Proposed cameras required to be integrated with security alarm system are fifteen numbers.

  2. The Manual Call Points encased in metal casing, push button type protected with transparent fiber sheet are required to be installed.

  3. The hooters to be installed in outer periphery of building with 120 DB sound capacity are 6 in numbers and hooters with 90 DB capacity for internal are fourteen in numbers.

  4. Route indicators to be installed in actual physical path with LEDs and also in GUI.

  5. Power cable to be laid is armoured copper type of 4 core 1.5 square mm dimension. CAT 6 cable to be laid as per the system requirement.

  6. Maximum distance from the main control panel to repeater panel is 200 meters approximately.

Shri K.V. Sivaraman, AGM (Estate) advised the participants to strictly adhere to the timeframe for completion of the project. Further, he advised them to fully satisfy themselves of the customized requirements of RBI by inspecting the existing system and submit the tenders without any deviations.