Date : Feb 11, 2022
Minutes of Pre-bid Meeting - Design, Supply, Installation, Testing and Commissioning of IP CCTV Surveillance System in the Bank's Staff Quarters at Chembur and Malad in Mumbai

Corrigendum

RBI/Mumbai/Estate/267/21-22/ET/358

Minutes of Pre-Bid meeting held on February 08, 2022 at 03:00 PM

Prebid meeting for the above tender was conducted on February 08, 2022 at 03:00 PM online through Cisco WebEx platform. The estimated cost of the work is Rs. 18 Lakh.

At the onset of the meeting AGM (GM) informed the participant vendors that; allowing taking part in the pre-bid meeting does not qualify them to quote for the work. The qualification or otherwise will be intimated and only qualified vendors based on the scrutiny of the PQR documents submitted by them before the due date, will be eligible to participate in the tender.

2. The following queries were sought by the firm in the meeting and further by e-mails dated 08/02/2022 and 09/02/2022-:

Tender Document Page No/Clause. Query by the vendor Comments/Clarification by Bank
Page 8/ Section II Vendor enquired if for pre-qualification criteria, they require to submit work orders and completion certificate for work pertaining before November 2016 or after Nov 2016 The vendor was informed that as per Para 2 of NIT for work experience of 5 years vendors are required to submit at least one work order and completion certificate for similar works done before November 30, 2016. As as per Para 3 (a)/(b) and (c), for current work experience of work order value 40%, 50% and 80% respectively, vendors are required to submit work orders and completion certificate for similar works done by them on or after November 30, 2016.
Page 138/BOQ Vendor was of the view that only CAT-6 will not be enough and OFC will be required for the work Instead of CAT 6 cables, vendors shall use OFC armoured cables for connectivity between NVR and POE Switches. Charges of above may be included in SOQ (Price bid) item 1.1 and 1.5 of the tender.
Page 138/BOQ Vendor enquired about who will look after the CPU provided by the Bank, during the AMC period. CPU to be installed in security post will be provided by Bank as a one time measure, there after its software and hardware maintenance shall be looked after by the vendor. Same shall be covered under CAMC. Vendor is required to provide CAT 6 cable to keep CPU in LAN.
Page 138/ Point 4 The vendor enquired that the Cat -6 Armoured cable of 4800 mtrs mentioned in BOQ is total for the two colonies? As per BOQ item 4, CAT 6 cable estimated quantity 4800 meter is for both the properties. This quantity is in addition to quantity of OFC cable to be used as mentioned as above.
Page 138/BOQ The vendor enquired about the type of conduit pipe. As per BOQ item 5, 20 mm dia FRLS, PVC Conduits are to be used.
Page 86/ 2. Short Range Camera: The vendor has requested to amend the certification by UL,BIS, CE, FCC, RoHS. As per tender specifications page 85 to 87 only FCC,ULBIS certification is approved however Bank will also accept certification by CE, RoHS also.
Page No. 87, 3. Long Range Camera The vendor has requested to amend the certification as UL/BIS, CE, FCC, RoHS. As above
Page 89 The vendor has requested to remove approved make for GI Pipes. It will be supplied as per avability of the Materials during executions. As per BOQ item 3, G.I. Pipes (poles) are required to provided and same shall be used as per one the of approved make given in the tender.
Page 83; Point 4 Any Buy back equipment will be part of this RFP. If yes then please share us the details of the equipments which need to be considered for buy back. There is no buyback equipment covered as per BOQ.
Page 89/ Para B Accept Sparsh as approved brand in CCTV Product.

As per government notifications preference will be given for Make in India Product. Sprash as OEM had manfacturing unit in India
Sparsh as approved make can be accepted provided it confirms technical specifications given in tender page No 85 to 87.
Page 2/ SOT The estimated cost of the project is Rs.18 Lakhs.

Does it includes 7 years AMC also or it is only for the supply and installation.
Estimated cost Rs. 18 Lakh is excluding CAMC charges.
Page 75/Scope of Work Kindly clarify whether AMC for 7 years includes cabling also as cabling can go bad due to digging, Rat bite, natural calamities or similar causes. During CAMC period scope of work will be as per clause SC9, Page 75 to 78. Cost of replacement of underground cables are not included in scope of AMC, however, contractor is required to lay overhead cable at their cost to restore CCTV system temporarily till completion of replacement of underground cables.
Page 81/ Point viii OEM Test Certificates of all products are required or only for Cameras and NVR OEM test certificates required for cameras, NVR and POE switches only.
Page 83/ Point 4 What are the items for buyback? There is no buyback item in SOQ.
Page 89/ Point B Can we quote brands other than those mentioned in the Approved Make list? Only approved makes of materials will be accepted.
Page 92/ Schedule B Is it mandatory to print, sign, stamp, scan and upload each and every page of the tender document as mentioned in Checklist and Information / Compliances to be uploaded by the Bidders on page 92? All tender pages where signature of bidder with seal is indicated, should be uploaded.
Page 105/Clause 34 Staff is required only during installation period or during AMC also? Deployment of staff as indicated on page 105 is required during execution of project on continuous basis. Required staff shall be deployed by vendor during CAMC period on call basis
Page 133/ Annex 13 The land Border Sharing undertaking should be given by OEM of the bidder and not by bidder themselves. As per Annexe 13 on tender page 133, Undertaking/declaration/Certificate by the bidders regarding country sharing border with India. Bidder may submit the same in consultation with their OEM.
Page 138/ Unpriced Bill of Quantity Why is Monitor with keyboard and mouse required For BOQ item 1.6 and 1.7 only 32” & 27” HD LED monitor respectively to be supplied. Remaining items including key board and mouse are not required.
Page 2/ SOT/ point g As per government of India guidelines, MSME vendors must be given exemption. Bid Security Declaration can be submitted in place of EMD by MSME vendors. The captioned guideline is not applicable to for estimated cost of work 18.0 Lakhs. RBI provides exemption to MSMEs having Udyam Registration Number from payment of EMD amount for works with estimated cost upto Rs. 10 Lakh.
Page 84/ Para 7.3 The vendor has requested that the Test certificate as well as OEM MAF should be made compulsory only for Cameras and NVR as All other products/items do not required MAF and Test certificate as it will be difficult to get those from OEM’s for small items OEM test certificate shall be submitted for NVR, Cameras and POE switches only.
Page 83/ Para 2 CE FCC and UL certificate - All items (Cameras and NVR) should be CE, FCC and UL listed Camera and NVR shall be UL, BIS, CE, FCC, RoHS certified.
Page 138/BOQ Vendor has requested that Fiber cable, Fiber termination with Media converter items may be added in BOQ which will give additional back bone wherever cable length is more than 200-300 Mtrs. Cost of required quantity of OFC cable and it’s termination shall be covered under SOQ item 1.1 and 1.5
Page 138/ S.No 1.5 of BOQ Sr. No.1.5 in BOQ to be rectified as per Technical specifications AS per SOQ item number 1.5 specifications of POE switch is 8 port POE 10/100 it is now revised as 8 port POE 10/100/1000 BASE-T POE parts + 2x SFP ports as per technical specs no 4, Page no. 87
Page 85/ Clause 7.7 The vendor has requested to include CP Plus make which is an Indian OEM meeting all the tender parameters and the certifications. CP Plus make can be accepted provided it confirms all technical specs given in tender page No 85 to 87.
Page 85/ Clause 7.7 The vendor has requested to remove UL Certification from cameras, as BIS is a standard in India UL or BIS certification as well as others approved by Bank shall be accepted.

3. All other terms and conditions of the tender shall remain unchanged.