Corrigendum NIT No.:- RBI/Central Office / Premises Department/1/19-20/ET/173 Pre bid meeting for the captioned tender work was held on November 20, 2019 at 11.30 Hrs. in the 5th Floor, Conference Room of Premises Department at RBI, COB, Fort, Mumbai. The details of Minutes of Pre- Bid Meetings are as under:- S. No | Clarifications / Issues raised / amendment sought by agency | Reply / Clarifications by the Department | 1. | Requirement of Isolation Transformer | It was clarified that Isolation Transformer can be accepted with externally as well as internally also. | 2. | Requirement of Reserve Phase sequence protection. | It was advised to provide inbuilt Reserve Phase Sequence. | 3. | Requirement of additional batteries along with UPS to match D.C Voltage. | It was clarified that additional batteries shall be supplied by the Bank, if required. | 4. | Requirement of Make / OEM | It was clarified that OEM i.e. Riello Power and Delta is under approved make. | Note: - All firms are advised to provide remote indication panel, Earthing and new interconnecting cables from UPS to battery bank excluding interconnecting cables between the batteries as per tender specification. All firms are also advised that no deviation in commercial terms and conditions will be accepted by the Bank and all other technical specifications will be strictly as per the tender and all the points/clarifications/ deletions/additions will also part of the tender specifications and agreement. | |